Work Breakdown Structure
[Name of the Writer]
[Name of the institution]
[Date]
Project Scope Statement
Project Name
Building Renovation Project
Project Timeline
The project is starting from 03/1/2019 and will finish on 6/30/2019 if no delay comes.
Budget for Project
List of Expected Project Cost
Main Constituents of Renovation
Expected Budget
Hiring of Project team
$50,000
Assurance of structural stability
$5000
Demolishment
$8000
Major work of building
$9000
Flooring
$5000
Plumbing and Electric Services
$12,000
Passage for Elevators
$20,000
External Work
$4000
Interior Finish
$5000
Total
$118,000
Project Objective
The purpose of this renovation project is to remodel and reshape the 2nd and 3rd floors of the existing building so that the capacity for the company’s newly established departments can be increased. The idea is to bring more efficiency in the workplace by modifying the physical space available to the company.
General Objective
The aim is to enhance the productivity of all the employees and build a comfortable and peaceful environment for the company’s staff to work.
Specific Objective
Reorganize and repair the two floors of the building according to the potential capacity.
To design the two departments in such a way that it facilitates the newly hired human resource.
Project Deliverables
The deliverables that will be received during every phase and at the end of the project. They are as follows:
Renovated 2nd floor with 40 new cabins
Renovated 3rd floor with partition of 5 rooms
2 additional restrooms
2 elevators
Extra space for new employees
Waiting area
Separate meeting room
I.T room
Redesigned windows on each floor
Doors for the floors
Small room for utility services control
Kitchen for each floor
Project Milestones
Approval of Government Authority for renovation
Acceptance of Planning Commission
Framing in given time
Partitioning
First Fix
Interior Finish
External work
Technical Requirements
Experience of Project Manager
Earth Work in both the floors
Fire Protection
Weather tight structure
Plumbing Specialties
Insulation expertise
Windows suitable location
Spacing of Cabins with electronic equipment
Proper allocation of wiring
Limits and Exclusions
Project scope document must keep in consideration which aspects are included in the project scope and which are out of project scope. Below are the functions mentioned which limits the project scope. They are:
In Scope Inclusions of Project
Renovation of 2nd floor and the walls
Renovation of 3rd floor and the walls
Rebuild the roof
Redesign the structure
Wiring
More space for cabins
Project Exclusions
Not more than 40 cabins which makes other cabins congested
Heating and ventilating
Air conditioning system
No material will be used which has a validity of only 5 years
Electronic setup
Use of Glass in windows
-36195042862500Work Breakdown Structure (WBS)
References
Lock, D. (2017). The essentials of project management. Routledge.
Lock, D. (2016). Project management in construction. Routledge.
Siami-Irdemoosa, E., Dindarloo, S. R., & Sharifzadeh, M. (2015). Work breakdown structure (WBS) development for underground construction. Automation in Construction, 58, 85-94.
Burtonshaw-Gunn, S. A. (2017). Risk and financial management in construction. Routledge.